Smart Energy

Distribution Automation Testing Series

Feeder Automation (FA) Test System

This system provides utilities with a solution for on-site testing of FA systems without power interruption. It is applicable to centralized FA, locally controlled FA, intelligent distributed FA, and optical differential protection systems, and can also be used for laboratory testing by power research institutes and manufacturers.

 

Integrated Distribution Terminal Test System

This system enables automatic closed-loop testing for various types of distribution terminals, suitable for type tests, factory acceptance, sampling inspection, and incoming inspection. It can be customized according to client requirements.

 

Automated Test Line and Smart Warehouse

This solution enables fully automated, intelligent, and informatized management of the entire testing process for terminals (DTU, FTU, TTU, fault indicators), including loading, conveying, testing, unloading, returning to storage, and result judgment. It is designed for mass production line testing of distribution terminals.

 

DPAS (Distribution Power Application System) Test and Verification System

The distribution network simulation module provided by Wiscom simulates the primary grid structure and various electrical data. By importing the model into the master station DPAS via an interface, it provides injected data for advanced application functions like analysis and control.

 

EV Charging Pile Test Products

These products test functionalities such as energy metering, conductive charging interoperability, and communication protocol conformance for AC/DC charging piles. They are suitable for metrology institutions, power utilities, and manufacturers for quality control.

 

On-site Testing and Calibration for Distribution Terminals

Wiscom's on-site testers allow installation, commissioning, and O&M personnel to perform functional and performance tests on distribution terminals, as well as inspect and debug their internal batteries. The on-site calibrators are used for line verification during terminal installation, core unit data verification for integrated terminals, and parameter detection of distribution transformers before and after line commissioning.

 

Integrated Primary & Secondary / Complete Set Test System

This system performs automatic closed-loop testing of the functionality and electrical performance of various primary switches/RMUs, etc. It is applicable for type tests, factory acceptance, sampling inspection, and incoming inspection, and is customizable.

 

Real-Scenario Joint Commissioning and Acceptance System

This system enables automated "three-remote" (telemetry, telesignaling, telecontrol) testing, addressing the post-installation acceptance requirements for distribution automation terminals while improving testing efficiency.

 

Test Management and Control System for DA Equipment

This system manages the testing quality of hierarchical inspection platforms, enabling unified management of provincial-level test plans and centralized control and analysis of test data. The Feeder Automation Test Management and Control System is designed for the unified management of provincial test plans, models, graphics, processes, and results, facilitating comprehensive aggregation, statistics, and comparative analysis of test information.

 

Model and Message Validation Tool

This is a validation toolset for IEC 61968 models and message specifications, provided for power equipment manufacturers and grid companies. It performs metadata validation of IEC 61968 information models, XSD-based normative validation of business messages (IEC 61968-3~10), and online validation of grid information model consistency and message compatibility.

Image name

Welcome to follow the Wiscom System official account or call us for more details!

025-52762828

Image name

Follow Jinzhi Technology

Copyright © Wiscom System Co., Ltd. Website Development: Zhongqi Dynamics, Nanjing